CD-B SUBMISSIONS MADE DURING APPLICATION DETERMINATION PERIOD

CD-B

SUBMISSIONS MADE DURING APPLICATION DETERMINATION PERIOD

Core Document Ref

 

Document Title

 

Document Reference (Submission Date)

B1

Environmental Statement Vol 2 - Main Statement

RPT.EIA.VOLII.JW.2 (08.12.21)

B2

Flood Risk Assessment and Drainage Strategy

20073-BGL-XX-XX-RP-D-00001

(16.12.21)

B3

Community Fund Information Sheet

N/A (25.01.22)

B4

Revised EIA documents:

 

ES Vol 3 - Appendix 10.1 – LVIA Appraisal Plans

ES Vol 3 - Appendix 10.2 – LVIA Methodology and Tables ES Vol 4 – Figure 3.1 - Parameters Plan

 

LAJ-1 (15.02.22)

ES Vol 3 Appendix 10.2 (15.02.22) 4263-CA-00-00-DR-A-00075-P16 (15.02.22)

B5

J10 M42 Planning Statement

RPT.007.JW.1 (15.02.22)

B6

Amended Parameters Plan submitted 16.02.22

4263-CA-00-00-DR-A-00075-P16

(16.02.22)

B7

Landscape Visual Impact Appraisal Amendments

LAJ-1 (16.02.22)

LAJ-2A (16.02.22)

LAJ-2B (16.02.22)

LAJ-3 (16.02.22)

LAJ-4 (16.02.22)

B8

LVIA Methodology submitted 16.02.22

N/A (16.02.22)

B9

Design and Access Statement

 

PL4 - Part 1 (p.1-65)

4263-CA-00-XX-RP-A-

06005_Design and Access Statement PL4 (19.04.22)

B10

Design and Access Statement

 

PL4 - Part 2 (p.66-144)

4263-CA-00-XX-RP-A-

06005_Design and Access Statement PL4 (19.04.22)

B11

Design Guide:

PL5 - Part 1 (p.1-55) PL5 

PL5 - Part 2 (p.56-106)

4263-CA-00-XX-RP-A-

06004_Design Guide PL5 (19.04.22) N/A (19.04.22)

B12

Archaeological Evaluation Report 

N/A (19.04.22)

B13

Birmingham Live Article March 2022 - Addendum to Appendix 12 of HGV Parking Need Assessment

N/A (19.04.22)

B14

Photos of Existing Laybys on A5

N/A (19.04.22)

B15

Illustrative Landscape Sections

N/A (27.05.22)

B16

Proposed Connectivity Plan - Route Type and Surface

4263-CA-00-00-DR-A-00803-P3 (01.09.22)

B17

Existing Connectivity Plans: Route Surface

 

Existing Connectivity Plans: Route Type

 

 

4263-CA-00-00-DR-A-00802-P3 (01.09.22)

4263-CA-00-00-DR-A-00801-P3 (01.09.22)

B18

Community Integration Route Plan:

 

Birchmoor to Dordon v3

Freasley to Polesworth v2

 

 

N/A (01.09.22)

N/A (01.09.22)

B19

Commuter Point Plan:

 

Dordon to Relay Park v5

Polesworth to St Modwen Park v4

Site Allocation H4 to Centurion Park v3

Site Allocation H5 to Birch Coppice v4

Stonydelph to Core 42 v3

 

 

N/A (01.09.22)

N/A (01.09.22)

N/A (01.09.22)

N/A (01.09.22)

N/A (01.09.22)

B20

Statement of Community Engagement Addendum (inc. Appendices)

N/A (01.09.22)

B21

The Future of Freight Plan - Planning Note

N/A (01.09.22)

B22

Indicative Proposed Fitness Trail

4263-CA-00-00-DR-A-00084-P6 (01.09.22)

B23

Walking Routes Plan

220810_403.11077.00001_Walking

Routes_EW.dwg (01.09.22)

B24

Planning Statement Addendum (Transport)

RPT.008.2.JW.70075293 (06.02.23)

B25

Revised Transport Assessment:

 

Part 1 (p. 1-381) Full Report to Appendix B

Part 2 (p. 382-557) Appendix C - E

Part 3 (p.558 - 665) Appendix F - J

Part 4 (p.666-673) Appendix K - L

Part 5 (p.674-705) Appendix M-N

784-B033920 (06.02.23)

B26

Revised Framework Travel Plan

 

784-B033920 (06.02.23)

N/A (06.02.23)

B27

Rail Terminal Connectivity Statement - Technical Addendum

222047r_railaddendum_verfinal (27.04.23)

B28

Indicative Masterplan INST+ Specification

4263-CA-00-00-DR-A-00090-SK5 (25.07.23)

B29

Proposed Elevations:

 

Proposed Middle Unit Elevations

Proposed North Unit Elevations

Proposed Smaller Unit Elevations

Proposed South Unit Elevations

 

 

4263-CA-00-00-DR-A-05009-SK3 (25.07.23)

4263-CA-00-00-DR-A-05010-SK3 (25.07.23)

4263-CA-00-00-DR-A-05011-SK2 (25.07.23)

4263-CA-00-00-DR-A-05008-SK3

(25.07.23)

B30

Landscape and Visual Impact Assessment Drawings:

 

REV D Section A Drawing

REV D Sections B+C+D Drawings

 

 

LAJ-54 (25.07.23)

LAJ-55 (25.07.23)

B31

Landscape and Visual Appraisal Drawings:

 

Wirelines DB

REV E Type 3 Photomontages

Viewpoint Photography

 

 

LAJ53-56 (25.07.23)

LAJ56-70 (25.07.23)

LAJ5-48 HD (25.07.23)

B32

Precedent Images of Development submitted 25.07.23:

 

Image 1

Image 2

Image 3

Image 4

Image 5

N/A (25.07.23)

B33

SLR Response to Review of Additional Information prepared by LUC

403.11077.00001 (25.07.23)

B34

Full Resolution Version of Design and Access Statement

 

4263-CA-OO-XX-RP-A-

06005_Design and Access Statement PL4 (25.07.23)

B35

Revised Design Guide PL6 

Part 1 - p1-42

Part 2 - p43-55

Part 3 - p56-95

Part 4 - p96-124

4263-CA-00-XX-RP-A-

06004_DESIGN GUIDE PL6 (25.07.23)

B36

Planning Statement Addendum (DNP)

RPT.008.1.JW (01.12.23)

B37

Amended Parameters Plan

4263-CA-00-00-DR-A-00075-P18 (01.12.23)

B38

Amended Proposed Connectivity Plan

4263-CA-00-00-DR-A-00803-P6 (01.12.23)

B39

Transport Assessment Addendum

784-B033920 (07.02.23)

 

 

B40

Photos of Existing Laybys on A5 - Addendum

N/A (21.12.23)

B41

Proposed Indicative Masterplan

4263-CA-00-00-DR-A-00095 P1 (21.12.23)

B42

Proposed Hub Office

4263-CA-00-00-DR-A-00080 P4 (21.12.23)

B43

Indicative Proposed Fitness Trail

4263-CA-00-00-DR-A-00084 P7

(21.12.23)

B44

Zero Emission Goods Vehicles Statement

220053r_zero_emissions_goods_ve hicles_statement_ver5 (21.12.23)

B45

Employment, Skills and Training Statement

RPT.015.JW (22.12.23)

B46

Coventry and Warwickshire Chamber of Commerce – Letter of Support dated 07.10.22

N/A

B47

JLL – Letter of Support Land NE Junction 10 M42 dated 18.11.22

N/A

B48

Logistics UK Letter of Support dated 12.11.22

N/A

B49

Maritime Transport – Letter of Support dated 29.09.22

N/A

B50

NaVCIS – Letter of Support dated 10.06.22

N/A

B51

Rail Freight Group – Letter of Support dated 02.11.22

N/A

B52

Road Haulage Association – Letter of Support dated 22.11.21

N/A

B53

Tamworth Borough Council – Letter of Support dated 07.01.22

N/A

B54

Warwickshire Police – Support dated 10.05.22

N/A

B55

TRANSYT 2023 Validation Report and Correspondence:

TRANSYT 2023 Baseline Validation Report Final

NH Validation Review and Attachment dated 21.09.23

TRANSYT 2023 Baseline Model – TT Response dated 09.10.23

NH Validation Comments and Attachments dated 26.10.23

TT TRANSYT Comments and Attachments dated 30.10.23 NH TRANSYT Validation Comments dated 27.11.23

TT Email on TRANSYT Validation and Attachments dated 30.11.23

 

 

N/A (21.08.23)

N/A (21.09.23)

N/A (09.10.23)

N/A (26.10.23)

N/A (30.10.23)

N/A (27.11.23)

N/A (30.11.23)

B56

Road Safety Risk Assessment (GG104) Parameters Note

784-B033920 Land North East of M42 Jn10 (01.11.23)

B57

221107_403.11077.00001_SLR_response to LUC v2

Indicative Bund Location Plan - 230124_403.11077.00001_LAJ-53_EW_r

Photosheets - 221107_403.11077.00001_LAJ_5-48

Walking Routes Plan - 221024_403.11077.00001_LAJ-52_Walking Routes_EW_

Wirelines - 230123_403.11077.00001.LAJ-53-56_WIRELINES_DB

ZTV Plan - 221019_403.11077.00001.29.LAJ-51_ZTV_DB

 

Submitted 27.01.23